SAM exclusions

FAR overhaul part 9: what changed for SAM exclusions

The overhaul's part 9 text (Aug. 21, 2025, updated Nov. 17, 2026) keeps what an exclusion does but changes the procedure: records use the legal business name and physical address, agencies count business days, agreements are filed in SAM.gov's integrity records, and a new cause covers clause 52.222-90. It applies only at agencies that adopted the part 9 class deviation.

Updated November 23, 2026Sources FAR overhaul part 9 model deviation text; FAR subpart 9.4 and 9.104-5 (FAC 2026-01); RFO FAQs and deviation guide; CPARS

What the part 9 text is

FAR part 9 covers contractor qualifications, and its subpart 9.4 is the rulebook for SAM exclusions in federal contracting: who is listed, what a listing does, and how suspension and debarment work. Under the Revolutionary FAR Overhaul, the FAR Council rewrote part 9 as model deviation text. The acquisition.gov deviation guide dates it “Issuance Date: August 21, 2025 UPDATE: November 17, 2026”.

Model deviation text is not the codified FAR. The overhaul FAQs explain: “Model deviation text is language developed by the FAR Council that agencies are expected to implement through their own deviations to the FAR.” “An agency adopts model deviation text by issuing a class deviation”, and “The model deviation text for a particular FAR part is not applicable to an agency until the agency has issued a class deviation.” The codified text it sits beside is FAR subpart 9.4 at FAC Number: 2026-01, effective 03/13/2026.

This page compares the two texts for what matters to an excluded or listed entity and to a checker. Our page on the FAR overhaul and SAM.gov covers parts 4 and 52 and the reps, and our SAM exclusions hub explains exclusions under both texts.

Which text binds an agency

An exclusion is entered by the agency that took the action, so the agency's adoption decides which procedures it followed. On Nov. 23, 2026 the deviation guide listed 35 agencies under part 9, including the Department of Defense, GSA, HHS, Homeland Security and Justice. The FAQs say agencies “are expected to adopt and start using the model deviation text within 30 days of when the FAR Council issues the text”, and point to the guide: “To confirm whether an agency has issued a class deviation for a particular FAR part, visit the RFO webpage”.

The effect of a listing reaches every agency either way. Both texts keep FAR 9.401's rule that a nonprocurement exclusion from Aug. 25, 1995 on is effective as a debarment or suspension, and 2 CFR part 180 is not part of the overhaul. A checker relying on SAM does not need to know which text the listing agency used; the excluded entity does, because the procedures it can use are in that text.

What stays the same

Most of subpart 9.4 carries over in substance. Both texts keep:

  • The effect of a listing: no solicitation, award or consent to subcontracts without a compelling reason (FAR and RFO 9.405(a)), and the two checks of SAM, after offers arrive and right before award (9.405(e)).
  • The prime's limit: “Contractors are prohibited from entering into any subcontract in excess of $45,000, other than a subcontract for a commercially available off-the-shelf item” (RFO 9.405-2(b); the codified FAR says the same), and clause 52.209-6 for contracts over $45,000 (9.409).
  • Notice by email to the SAM point of contact, which the January 2025 FAR rule added to the codified FAR before the overhaul (9.406-3(c)(1)); the 30 days to respond; the 45-day decision; the contractor's burden; the periods of debarment and suspension.
  • The definitions added in January 2025, including the pre-notice letter, administrative agreement and voluntary exclusion (9.403).

The overhaul's part 52 keeps 52.209-6 in substance. Its text still requires each proposed subcontractor over the threshold “to disclose to the Contractor, in writing, whether as of the time of award of the subcontract, the subcontractor, or its principals, is or is not debarred, suspended, proposed for debarment, or voluntarily excluded by the Federal Government” (RFO 52.209-6(c)). The clause line by line is on our page on FAR 52.209-6.

The changes, side by side

Here is subpart 9.4 of the two texts compared section by section (codified FAR, FAC 2026-01; overhaul part 9, updated Nov. 17, 2026). Leaving aside wording changes with no change in meaning, these are the differences:

SectionCodified FAR (FAC 2026-01)Overhaul part 9 textWho it affects
9.404(b)(1), the record“Names and addresses of the entities debarred”“Legal business name and physical address of the entities debarred”Listed entities; checkers matching a record
9.404(c)(3), entering and updating“within 3 working days after the action becomes effective”; updates “generally within 5 working days”“within 3 business days after the action becomes effective”; updates “generally within 5 business days”Agencies; how soon a record appears
9.404(c)(7) and (d), help with SAM“Contact GSA for technical assistance with SAM, via the support e-mail address or on the technical support phone line.” “SAM is available via https://www.sam.gov.”Both removed; 9.404(a)(1) now names “System for Award Management (SAM) at https://www.sam.gov”Agencies
9.406-3(f) and 9.407-3(e), administrative agreements“access the website (available at https://www.cpars.gov, then select FAPIIS)”“access the integrity records part of the SAM.gov Workspace, enter the requested information, and upload documentation reflecting the administrative agreement”Entities that settle; anyone reviewing them
9.406-3(g) and 9.407-3(f), voluntary exclusions“access the website (available at https://www.sam.gov) and enter the requested information into the exclusions section of SAM”“access the integrity records part of the SAM.gov Workspace and enter the requested information into the exclusions section of SAM”Entities that agree to be excluded
9.406-2(b)(1) and 9.407-2(a), causesNo DEI cause“Failure to comply with the requirements of clause 52.222-90, Addressing DEI Discrimination by Federal Contractors.” (debarment (viii); suspension (11))Contractors under 52.222-90
9.406-2(b)(1)(v) and 9.407-2(a)(7), taxes“Delinquent Federal taxes in an amount that exceeds $10;000.” (as printed), with four worked examples“Delinquent Federal taxes in an amount that exceeds the threshold at 9.104-5(a)(2).” Examples removed.Contractors with tax debts
9.400(c), FASCSA orders“For Federal Acquisition Supply Chain Security Act (FASCSA) orders, see subpart 4.23.”“For Federal Acquisition Supply Chain Security Act (FASCSA) orders, see part 40.”Readers looking for FASCSA rules
9.406-3(h) and 9.407-3(g), pre-notice letters“a pre-notice letter may be issued at the discretion of the agency suspending and debarring official”“the suspending and debarring official has discretion to issue a pre-notice letter”No change in meaning

The sections below explain the ones that change what you do.

The record: legal business name and physical address

The codified FAR lists an excluded party's “Names and addresses”; the overhaul text asks for the “Legal business name and physical address” (9.404(b)(1)). Those are the two words SAM.gov's entity validation already uses: uniqueness rests on “a combination of the legal business name, physical address, start year, state of incorporation” (KB0045979). For a checker, a record built on the same name and address as the registration makes a comparison easier. For a listed entity, it is one more reason to keep the registration's legal business name and physical address correct; our page on legal name and address changes covers how.

The rest of the record is unchanged: the agency, the cause, the effect, the end date, the UEI, a tax ID “if available”, and the agency contact (9.404(b)). How each field appears on a public record is on our page on reading an exclusion record.

Working days become business days

Under the codified FAR an agency enters a record “within 3 working days after the action becomes effective” and updates it “generally within 5 working days after modifying or rescinding an action” (9.404(c)(3)). The overhaul text says business days in both places. The grants rule already used that term: an agency acts “within three business days” (2 CFR 180.520). Two sentences in the overhaul text still say working days: the three days for documenting an administrative agreement or voluntary exclusion (“The submission should be made within 3 working days.”, 9.406-3(f)(2) and (g)(2)), and the nonresponsibility documentation in 9.105-2. For a listed entity the practical point is the same under both: a record can appear within days of the decision, and an update after a reduction or reinstatement can take up to a week.

Agreements and integrity records move into SAM.gov

The biggest operational change is where officials file. Under the codified FAR an administrative agreement goes to FAPIIS through CPARS, and a voluntary exclusion goes in “the exclusions section of SAM” through the main SAM.gov website. Under the overhaul text, the official “must access the integrity records part of the SAM.gov Workspace” for both (9.406-3(f) and (g); 9.407-3(e) and (f)). A voluntary exclusion still ends up in the exclusions section; an administrative agreement is still an integrity record, not an exclusion.

The systems caught up on Nov. 17, 2026. CPARS announced: “GSA expects to transition this functionality on November 17, 2026.” SAM.gov's home page then said “Integrity Records are now managed, created, and reviewed on SAM.gov.” The help desk adds what an entity sees: “When an integrity record is created against an entity, Entity Administrators will receive an email notification with details and instructions on how to view and comment on that record from their workspace in SAM.gov.” (KB0110116). The same article notes that the comment permission “only applies to Integrity Records at this time, but may be expanded in the future to include other adverse actions in SAM.gov (e.g., Exclusions)”.

Responsibility review moved with it. The codified FAR still has contracting officers consult FAPIIS “(available at https://www.cpars.gov)”; the overhaul text has them “review the responsibility/qualification (R/Q) records in the System for Award Management (SAM)” (9.104-6(a)(1)). The difference between those records and exclusions is on our page on exclusions and responsibility records.

A new cause: clause 52.222-90

The overhaul text adds one cause for debarment and one for suspension that the codified FAR does not have: “Failure to comply with the requirements of clause 52.222-90, Addressing DEI Discrimination by Federal Contractors.” (RFO 9.406-2(b)(1)(viii) and 9.407-2(a)(11)). The clause itself is in the overhaul's part 52. It has the contractor agree that “The Contractor will not engage in any racially discriminatory DEI activities;” and warns that on noncompliance “the Contractor or subcontractor may be declared ineligible for further Government contracts;” It flows down: “The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States.”

Who this binds: contractors whose contract includes 52.222-90, at an agency that has adopted the overhaul text. The cause exists only in the part 9 deviation text, so it is available only to agencies that adopted it. The general causes are on our page on causes for debarment and suspension.

Delinquent taxes: one threshold

Delinquent federal taxes are a cause for debarment and suspension in both texts. The codified FAR states the amount in subpart 9.4 itself, and the current text prints it as “exceeds $10;000.” (FAR 9.406-2(b)(1)(v), with a semicolon in place of the comma; FAR 9.407-2(a)(7) repeats it). The codified FAR's own 9.104-5, which has the contracting officer notify the official who starts debarment actions when an offeror reports a tax delinquency, uses a different figure: a “Federal tax delinquency in an amount that exceeds $15,000.” (FAR 9.104-5(a)(2)).

The overhaul text removes the mismatch by cross-reference: the cause is taxes “in an amount that exceeds the threshold at 9.104-5(a)(2)”, and its 9.104-5(a)(2) also says $15,000. It keeps the two tests for a delinquent tax (finally determined, and not paid when due) and drops the codified FAR's four worked examples (a notice of deficiency, a lien hearing, an installment agreement, a bankruptcy). Under the codified text the stated cause amount is $10,000; under the overhaul text, $15,000.

Plain language: shall becomes must

Much of the rewrite is style. "Shall" appears 74 times in codified subpart 9.4 and not once in the overhaul's subpart 9.4, which uses "must" or a direct instruction instead. The contracting officer's checks read differently, not differently in effect. Codified: “Immediately prior to award, the contracting officer shall again review the exclusion records in SAM to ensure that no award is made to a listed contractor.” Overhaul: “Immediately prior to award, review again the exclusion records in SAM to ensure that no award is made to a listed contractor.” (9.405(e)(4)).

One phrase that did change: on how a prior suspension relates to the debarment period, the codified FAR says “the suspension period shall be considered in determining the debarment period”, the overhaul “the suspension period factors in determining the debarment period” (9.406-4(a)(2)). How long each action lasts is on our page on how long a debarment or suspension lasts.

The proposed rules

The deviations are a bridge to rulemaking. The FAQs say “Once model deviation text has been issued for all FAR parts, the FAR Council will initiate the formal rulemaking process to incorporate the deviation text into the FAR, which could be modified after consideration of feedback received.” On June 25, 2026 OMB “announced the first of three releases of proposed rules to implement the Revolutionary Federal Acquisition Regulation (FAR) Overhaul”, and “Together, the proposed rules cover 17 FAR parts”.

These are proposals, not final rules. The OMB release does not list the 17 parts, so whether part 9 is in the first package is not listed. Until a final rule is published, codified FAR subpart 9.4 and each agency's adopted part 9 deviation are the texts that apply.

What to do now

  1. If your entity has a case at an agency, check the FAR part deviation guide for that agency under part 9, and read the notice for which text it cites.
  2. Keep the registration's legal business name, physical address and points of contact current: notices go to the SAM point of contact email, and the record uses the legal business name and physical address.
  3. Give the Review Adverse Actions permission to whoever should comment on integrity records about your entity; entity administrators have it by default.
  4. If your contracts include clause 52.222-90, treat compliance as an exclusion risk at agencies on the overhaul text, and flow the clause down as it requires.
  5. If you owe federal taxes, note the threshold your agency's text uses, $10,000 as printed in codified 9.406-2 or $15,000 by reference in the overhaul text.
  6. Watch the acquisition.gov overhaul pages for the next proposed rule packages.

Questions about the overhaul's part 9 and SAM exclusions

Does the overhaul change what an exclusion does?

No. The effect of a listing in 9.405, the $45,000 subcontract limit and the clause at 52.209-6 carry over. The changes are in procedure, filing systems and one added cause.

Is the DEI cause in force everywhere?

No. It is only in the overhaul's part 9 text, which applies to an agency once it adopts the part 9 deviation. “The model deviation text for a particular FAR part is not applicable to an agency until the agency has issued a class deviation.”

Where are administrative agreements filed now?

In the integrity records part of the SAM.gov Workspace under the overhaul text; the codified FAR still says FAPIIS at cpars.gov. SAM.gov announced that integrity records moved there in November 2026.

Do I still have 30 days to answer a notice of proposed debarment?

Yes, under both texts. The notice may come by email to the point of contact in your SAM registration.

Has part 9 been through notice and comment?

Not listed as of November 2026. OMB announced the first proposed rules on June 25, 2026, covering 17 FAR parts, without listing the parts in its release.

Sources